Latest news on railway lines, railway infrastructure, track technology, as well as track construction and maintenance

published in cooperation with


South Korea

Korail completes electrification of Gyeongjeon Line section

South Korean state railway Korail has completed the electrification of a 55.1 km section of the Gyeongjeon Line between Jinju and Gwangyang. Under a contract worth €119 million (KRW 168.3 billion), works on the project started in 2019. After the scheduled completion of all works on the double-track section in late 2024, Korail will start operating high-speed trains (HST) of the KTX-leum brand on the line. The works are planned to reduce journey times between Jinju and Gwangyang by 25 minutes.