Mongolian state railway MTZ has made significant progress on the construction of a 127 km rail freight transport bypass around Ulaanbaatar. Test runs are expected to begin in September 2026, with full operations potentially launching by the end of 2026. The line branches off the main line to the Russian border near Sükhbaatar at Emeelt, west of the capital, then bypassing Ulaanbaatar to the south via the Khushig Valley and rejoining the network at Bagakhangai, south-east of the city. The project valued at around EUR 288 million (MNT 1.2 trillion) includes three passing loops and bridges totalling around 2.5 km in length, including a 476 m bridge over the Tuul River. Construction on the 87.9 km Bagakhangai – Khushig Valley section began in April 2025, and, according to government sources, the main construction work on this segment is complete. The line runs near Chinggis Khaan International Airport, the Khushig Valley logistics zone and the planned Hunnu City. Once operational, the bypass will be able to divert up to 1,800 heavy trucks per day from the capital's road network. Initial transport capacity stands at around 3.5 million t per year, with the potential to increase to 20 million t in the future.